logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 광주지방법원 순천지원 2017.01.31 2016고단1945
사기
Text

A defendant shall be punished by imprisonment for a term of one year and two months.

Reasons

Punishment of the crime

[2016 Highest 1945] The defendant is the representative director of C (hereinafter “C”) who is a corporation for the purpose of the housing construction business, etc., and is related to the victim D and society distribution. E is a person who has made an error in writing in inducing investment in C in connection with the development of leisure and water ports. F is the Chairperson of C, G is the Vice-Chairperson of C, H is the Vice-Chairperson of C, H is the Corporation I of the leisure and inn and inn and inn and inn and inn, the defendant was introduced E and F from G around June 2014, and F is known to the same church.

H introduced the Defendant to the Defendant.

The Defendant, along with F and G, introduced the victim to the effect that “AS. CIA, the Government, and the New Political Democratic Union, etc. are related to the management of the funds of the former president, and the inducement of foreign capital,” with respect to “A” as to “A”, the Defendant introduced the victim to the effect that “A passenger car going on and out of H is a quasi-motor vehicle with the President of J, and is able to attract investment funds to large enterprises, and he is able to attract investment funds,” and he acts as if he/she has a friendly relation with his/her political rights, etc., and “A” prepares the draft of “harbor construction-related consultation agreement” under H’s name, and the Defendant and F entered into the said consultation with the Defendant and H seal affixed by e-mail, and then presented it to the victim, and thereby, presented it to the victim “the right to supervise the pent Corporation and the entire construction works.”

The defendant around June 2014, at the C office located in K in Sinh-si, there is a pents business in the two sides of the light, and the quantity is strict.

The construction works can be fully paid up to KRW 200,000,000,000 in relation to private construction works.

However, in order to prepare a contract and implement the project, the operating fund and the cost of the project are required.

arrow