(영문) 서울중앙지방법원 2018.09.14 2016가합546079
손해배상(기)
Text

1. The following among the lawsuits against the Plaintiff’s construction of Hansung Co., Ltd.

2.(a)

claim to exceed the money set forth in the subsection.

Reasons

Facts of recognition

The plaintiff is an autonomous management organization that consists of occupants of one building A of Mapo-gu Seoul Metropolitan Government 897 households (hereinafter referred to as "the instant officetel").

The business entity that constructed and sold the instant officetels, a commercial ambropyer Co., Ltd. (hereinafter referred to as the “ commercial ambypyer”) is the Defendant Hanhwa Construction Co., Ltd. (hereinafter referred to as the “Defendant Hanhwa Construction”) that constructed the instant officetels construction.

The Defendant Construction Mutual Aid Association (hereinafter referred to as the “Defendant Association”) is a surety that guarantees the obligation to repair defects after the inspection on the instant officetels of the Defendant Hansan Construction.

The warranty warranty period No. 1 B B 1 B 2014.3.28, 2015.28, 294 Da 2 C 23, 2014 from March 1, 2014 to February 28, 2015, to February 29, 2016, 46, 5573D 3D 2014 from March 1, 2014 to February 37, 2017, 4 E E E 4 E 2014 from March 1, 2014 to February 28, 2019, the warranty warranty liability of the instant officetel was guaranteed as the warranty warranty creditor after entering into the instant warranty warranty contract (hereinafter “the warranty warranty warranty liability of the instant case”).

Since then, the guarantee creditor of the instant guarantee agreement was changed from the upper Apptep to the Plaintiff.

The instant officetel’s defect occurrence and defect repair cost had undergone a pre-use inspection on December 5, 2013. However, the instant officetel’s defect occurred in the section for common use and section for exclusive use of the instant officetel by either failing to construct the part to be constructed, or changing the part to be constructed differently from the defective construction or design drawings.

The plaintiff is the defendant at the request of the tenant and the sectional owner of the instant officetel.