(영문) 서울중앙지방법원 2016.08.10 2015고정1691
재물손괴등
Text

Defendants shall be punished by a fine of KRW 500,000.

In the event that the Defendants did not pay the above fines, only 100,000.

Reasons

Criminal facts

Defendant

A and Defendant B are the joint representative director of the dispute resolution committee.

Around March 2013, the victim F shall enter into a contract for the construction of the commercial building (I building) on the 4th floor above H in Jung-gu Seoul Special Metropolitan City with the total of KRW 660,000,000,000,000, and the victim F shall begin the construction after the first payment of KRW 200,000,000 among the construction cost. After changing the housing of the 3th floor and the 4th floor during the construction process, the remainder of the construction cost was agreed to be appropriated for the security deposit for the house and to be paid while making a registration of the building, but the construction period was increased by one year. After approving the use of the building on May 27, 2014, the victim F registered to preserve the ownership on May 30, 2014, but the victim F did not pay the remainder of the construction cost on the 3rd floor and the 4th floor of the building.

A. On June 19, 2014, Defendant A: (a) destroyed property damage and interference with the business thereof on June 19, 2014; (b) obstructed the victim’s specialty and the operation of a private teaching institute by force that the victim’s specialty and the private teaching institute may not enter the private teaching institute’s private teaching institute, and interfere with legitimate business affairs on the victim’s specialty and the private teaching institute operation by allowing the victim to have access to the private teaching institute’s private teaching institute’s private teaching store and the private teaching institute’s private teaching institute’s private teaching institute operation, which is scheduled to operate the private teaching institute, on the ground that the owner of the copy of the register in the private teaching institute in Seoul Jung-gu Seoul Special Metropolitan City (hereinafter referred to as “victim”).

B. On July 18, 2014, Defendants who damaged property are connected to the wall surface with steel structure after installing steel structure at the main entrance of the first floor that enters the building within the I building located in the same place as paragraph (a) at around 16:04, July 18, 2014.