logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2018.11.28 2016가합559303
공사대금
Text

1. The Defendant: KRW 341,024,609 for the Plaintiff and KRW 5% per annum from May 1, 2016 to November 28, 2018; and

Reasons

A. As to the apartment of this case, approval for use by buildings was obtained

The entire approval for the use of the apartment of this case was made around May 2016.

4) On November 10, 2015, the Plaintiff and the Defendant indicated a modified contract to modify the provisional contract of this case on November 10, 2015 (a) stating that “foreign expenses” is stated in the upper part of the amendment contract for the construction work (the first part) as follows:

hereinafter referred to as “instant contract modification contract”

The contract was entered into. The contract was amended by the first (the first).

1. Construction name: New construction works of the A regional housing association;

2. Place of construction: B in Gyeyang-gu, Ansan-gu; and

3. Construction scale (based on the approval for use by Dong (based on July 30, 2015): 11,837.00 square meters: 2. Building area: 2,334.3350 square meters: 350 square meters: 35,00 square meters: 35,00 square meters: 239 households;

4. Period: 24 months from the commencement date of construction (from July 2013 to July 2015).

5. Unit cost of construction contract: 983 and 125 per square meter ing ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging ging gling ging ging ging ging ging ging ging ging ging ging ging g

6. Method of payment of construction expenses: The amount of construction work contract prescribed in paragraph (1) of Article 5 (2) of the terms and conditions of the provisional contract for non-high-quality construction work contract (contract amount) shall be paid to B under the terms and conditions of the provisional contract for construction work related to the payment of sale in lots, shall be the average unit price contract amount for the total floor area of the building, and the unit price shall be 3,250,000 per nex n

Provided, That the value-added tax on the construction cost of a building subject to the imposition of value-added tax shall be separately imposed.

1) The change of the status of the contractor shall be changed: C. 2).

arrow