logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 의정부지방법원 2017.03.23 2015가단35164
주위토지통행권확인 등
Text

1. The Plaintiff:

A. Defendant B and C are 1) Of 333 square meters on the D-road in Macheon-si (20,64, 21, 63, 62, 61, 60.

Reasons

1. Facts of recognition;

A. The Plaintiff is entitled to the ownership of the land related to the instant case (i) the Plaintiff’s ownership of the land, 1,08 square meters prior to Y and 3,329 square meters prior to H, Seocheon-si (hereinafter “Plaintiff-owned land”).

(2) Defendant B and C share the land of 1,695 square meters and D road of 333 square meters (hereinafter “instant road”), and the Defendant Republic of Korea owns the F ditch of 1,111 square meters (hereinafter “instant ditch”).

3) The J-J Forest land, adjacent to the left side of the instant road and ditch, is owned by K-J 10,604 square meters. B. The location and current status of the land related to the instant road, adjacent to the instant road, is as follows: (a) the land owned by the Plaintiff is located on the south side of the lines connecting each point of (i) the appraisal map No. 21 and No. 22, adjacent to the instant road; and (b) G land is located on the south side of the said road adjacent to H land.

The plaintiff cultivated each of the above land and uses the above land for the purpose of planting crops on the ground.

2) Meanwhile, adjoining to the road of this case, the land of this case is located on the left side of the line connecting each point of the attached Forms 12 through 17, and the land of this case is located on the right side, and the land of this case owned by Defendant B and C is located on the south side of the land of this case. Defendant B constructed and owns a house on the land of this case and used the road on the road of this case and ditch, and used it as a passage leading to the said house. 3) past J land had a passage connecting the land owned by the Plaintiff to the land of this case. Since April 29, 2016, the land of this case was installed on the road of this case connected to the part of the Plaintiff’s land owned by the Plaintiff after the completion of the lawsuit of this case, and the road of this case was installed on the road of this case which was connected to the part of the land owned by the Plaintiff, and the road of this case was installed on the road of this case, which used the road of this case.

4 The J land has a passage through which people can move from the contribution to the land owned by the plaintiff bypassing the passage of the preceding paragraph.

arrow