logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2016.05.11 2015가단210604
대여금
Text

1. The Defendants are jointly and severally and severally liable to the Plaintiff for KRW 30,477,405,981 and KRW 14,99,929,907.

Reasons

1. The description of the grounds for the claim shall be as specified in the attached Form;

(However, the creditor's "creditor" is "Plaintiff", "debtor" is "Defendant", and the lawsuit was withdrawn against the defendant Ssung Integrated Construction Co., Ltd. and the defendant Hyundai Cement Co., Ltd.

arrow