Text
Defendant
A Imprisonment of 10 months, Defendant B and C shall be punished by imprisonment of 8 months, and Defendant D by imprisonment of 6 months, respectively.
(b).
Reasons
Punishment of the crime
[2014 high group3486] Defendant A joined L Co., Ltd. (hereinafter referred to as “L”) around 198 and promoted to the chief around April 1, 2007, Defendant A as the team leader of the electric technology team from January 10, 2008 to December 20, 201; from December 21, 2011 to July 17, 2012, Defendant A worked as the team leader of the construction technology team from July 18, 201 to July 30, 2012; ① budget compilation and appropriateness analysis for each field of implementation; ② preparation and review of the project site; consultation on the selection of an enterprise; ⑤ examination of the project site selection; ⑤ modification of the construction site construction project; and support for the overall construction site management of the construction project; and ④ analysis of the construction site construction project site and other related overall construction project; and
Defendant
B, from September 2006 to July 12, 2013, as the representative director of M Co., Ltd. (hereinafter referred to as “M”), had been employed by L from January 30, 2007 to July 12, 2013, the construction of 56 cases in total, about 15.8 billion won in cooling pipes, system air conditioners, and machinery and equipment (vener facilities) was carried out.
1. Defendant A
A. Around November 2008, at the 30th L office in Gangnam-gu Seoul Ndong-gu Seoul, demanded the said B to make a self-furd passenger car.
On November 20, 2008, the Defendant: (a) opened one motor vehicle with soflurt under the pretext of a solicitation made to the effect that the convenience would be changed at the construction site; and (b) made the said B on the same day, in relation to the construction work for the installation of an additional construction cost due to the settlement, prompt settlement, design change, etc. of the construction cost in connection with the construction cost for the O-ju Complex Building, Gangwon-do P and Q apartment construction system installation, which was received from L from L from the above L in the Dong-dong apartment parking lot located in the Dong-gu, Seongbuk-gu, Seoul; and (c) made the said B the said day.