logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2020.08.20 2018가단5248476
구상금
Text

1. The Defendants, Defendant (Appointed Party), I, and J jointly deal with the Plaintiff’s KRW 68,207,426.

Reasons

1. Basic facts

A. From January 1, 2015 to December 31, 2015, the Plaintiff entered into a comprehensive insurance contract with the Korea Land and Housing Corporation for property risks that covers damage caused by fire, etc. in the instant building by using the insured Korea Land and Housing Corporation, the insurance coverage amount of 309,976,750 won, and the subject matter of insurance as the leased house owned by the Korea Land and Housing Corporation (hereinafter “instant building”).

B. Defendant B and E are born in 2002, and Selection is the 2001 student, Defendant B, E and Selection (hereinafter collectively referred to as “Defendant B, etc.”) are the following:

At the time of the occurrence of the fire described in the paragraph, he/she is a relative who is enrolled in the second year of L Middle School of 13 years old.

C. Defendant D and C are the parents of Defendant B, Defendant F and G are the parents of Defendant E, Defendant H (Appointed Party) (hereinafter “Defendant H”) and the Appointed Party J are the parents of the Appointed Party I.

At around 17:54 on May 26, 2015, Defendant B et al., while smoking tobacco at the parking lot of the first floor of the instant building, left the site without properly verifying whether Defendant B, while continuously attaching a cigarette to the paper paper paper paper stuffing string string, which was accumulated on one side of the instant parking lot, was taking a string string to extinguish a fire at the same time on the paper paper paper paper stuffing string, and then, he left the site.

Since then, there was a fire that had not been taken off, if the fire remains in the front of the instant building, to be moved to the front of the front string, then the fire that had been spread to the entire building of this case (hereinafter “the fire of this case”).

E. The fire of this case caused damage to be damaged or damaged by sleep as a whole from the inside and outside of the building of this case, and the Plaintiff paid KRW 97,439,181 to the Korea Land and Housing Corporation on September 21, 2018.

F. Defendant B.

arrow