logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2018.12.12 2017나7314
손해배상(기)
Text

1. The part of the judgment of the court of first instance against the plaintiff, which orders payment below, shall be revoked.

The defendant.

Reasons

1. Facts of recognition;

A. The building indicated in the separate sheet (hereinafter “instant building”) in the attached sheet between H and the Defendant’s contractual relationship formation 1)

2) As to the building permit, H Co., Ltd. (hereinafter “H”) as the owner of the building permit

Corporation I (hereinafter referred to as “I”)

(1) On July 31, 2015, the construction of the instant building was determined on December 30, 2015 as KRW 3 million (including value-added tax) and as of December 30, 2015 (hereinafter “instant construction”).

(ii) the contract agreement under which the project is made; (ii) the construction cost of KRW 1.6 billion on the same day (including value-added tax); and (iii) the GK LV on February 20, 2016 (hereinafter referred to as “nutrition-gun building”) shall be determined as the date of completion;

) New Construction Work (hereinafter referred to as “Nutrition”);

(3) On January 30, 2015, the construction of L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-based L-

A) A contract was entered into under the terms and conditions of the contract, and I had I perform each of the above construction works from the time of entering into each of the above contracts. 2) A entered into a contract with the Defendant on October 27, 2015, under the consent of H, and the Defendant performed each of the above construction works around that time.

B. On February 19, 2016, H drafted a letter of undertaking with regard to the instant construction, nutrition group construction, and L construction. 1. The L construction cost of L is agreed as KRW 81 million on February 29, 2016. The final agreement on KRW 4.5 billion for the construction cost of the instant construction work. 7. The total construction cost of the nutrition group construction works is KRW 1.668 billion, which was reduced from KRW 1.6 billion to KRW 1.68 billion (including value-added tax). The Defendant completed the construction work by March 10, 2016 by the date on which the construction work was received on February 29, 2016.

arrow