(영문) 대구지방법원김천지원 2019.02.01 2018가합16327
구상금
Text

1. The Defendant’s KRW 92,236,718 as well as the Plaintiff’s annual rate of 5% from May 24, 2018 to February 1, 2019, and the following.

Reasons

1. Basic facts

A. On January 2, 2018, the Plaintiff awarded a contract to the Defendant with respect to the removal of machinery and equipment and joints in the second floor and the first floor of the Plaintiff’s building (hereinafter “instant construction”) on the following terms:

The name of the contract: Article 1: The plaintiff of the contract amount shall place an order to the defendant in KRW 41,500,000 (excluding surtax) for the above contract amount, and the defendant shall be awarded the order.

Article 6: Safety Control and accident compensation (1) In order to prevent industrial accidents, the defendant shall take appropriate measures, such as the installation of safety facilities and subscription to insurance.

(2) The defendant shall be liable for any industrial accident that occurred at a construction site.

Name of construction specifications: Arrangement of construction sites for removal of facilities in Category 2 (One System)

1.The timeline shall be as follows: specifications and general matters other than specifications shall be subject to the direction of the supervisor, in respect of the removal works of the existing facilities within the type 2 and 1 building.

4.(1) Before initiating the removal, a plan for the method of removal and the contents of the work must be submitted to the supervisor and approved.(2) The plan shall contain a plan for blocking access by trafficmen, covering buildings, etc.

4) The removal work must be cut off or sealed on the supply facilities for the structure to be removed before the start of the removal work. 6) The removal work must prevent dust emitting dust, etc. which is surrounded by the surrounding sping school gr or temporary tent, etc., and (b) the installation of a vinyl to prevent the fall of the primary floor sub-loaned upper part of the primary floor, on the designated date, and the removal after the completion of the work of installing the office board.

13. Safety passage for traffic users in an area where removal works are in progress shall be guaranteed, and protective measures shall be taken where it is necessary to prevent damage to facilities, human lives, etc. due to removal works.

B. Meanwhile, the main contents of specifications prepared at the time of ordering the instant construction project are as follows.

C. The Defendant on January 8, 2018

arrow