본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
(영문) 서울동부지방법원 2016.07.05 2015가단45858
건물명도 등
Text
1. The defendant is against the plaintiffs:
(a) deliver the buildings listed in the separate sheet;
(b)payment of 27,836,800 won and c.
Reasons
1. The description of the grounds for the claim shall be as specified in the attached Form;
(A) A conciliation was made between the plaintiff and the co-defendant Construction Co., Ltd. and the Dosan Comprehensive Construction Co., Ltd.)