logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 2016.10.20 2015가단10280
손해배상(기)
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is the owner of C 5,121 square meters, D 2,674 square meters, E 1,428 square meters, F 1,75 square meters, G 1,844 square meters (hereinafter “instant land”).

On May 24, 2000, H (hereinafter “H”) obtained permission from Kim Jong-si to temporarily use farmland for other purposes for the purpose of collecting aggregate with respect to the instant land, which is farmland from Kim Jong-si, and he stockpiled aggregate on the said land.

Article 1 (Plaintiffs and H) and B (Defendants) of the purpose of the contract is to sell and purchase earth and sand accumulated in Kim Jong-si, Kim Jong-si, and other State-owned land.

2. Article 2 B The period of release after the purchase and sale shall be from July 12, 2012 to August 12, 2012 to the aggregate on the ground of the lot number specified in 1.

Article 3 Matters to be observed at the time of removal of aggregate, aggregate accumulated on the ground C or D (hereinafter "land 1") shall be restored under approximately 10 cm below the road of the above lot number, and where aggregate is removed from the above lot number, construction shall be carried out by the method of restoring the difference when the aggregate is removed from the above lot number, and the final restoration shall be allowed by the farmer at the time of removal.

Article 4 The term "State-owned and other private land-owned land" refers to 1,359 square meters in I, J-owned land, 387 square meters in J-si, and 1,045 square meters in K-si, Kim Jong-do.

The term "E, F, G land and L" means the area of 747 square meters prior to the date of Ma, F, G land and L owned by the private land.

(‘Second Land’) Aggregates do not take out only the outer part and do not work for the removal of only the outer part (on the basis of the outer part of the floor of the floor above the state-owned land). approximately 50 square meters of other private land must be filled up at present.

Article 5 Civil Petitions and Mining Claims B shall not cause civil petitions, and where C or D is sold too deep to the underground level, the compensation for the mining right shall be borne by B.

6. Sales amount of aggregate shall be KRW 78,000,000 (Additional Tax) and shall be paid immediately upon contract.

Aggregates may be built and taken out when the full amount of aggregate proceeds is paid.

7 The effect of the sales contract shall take effect at the time of full payment, and the construction shall be illegal within the period of release.

arrow