(영문) 대구지방법원 서부지원 2016.10.07 2016고단1704
횡령
Text

Defendants shall be punished by imprisonment for one year.

However, as to the Defendants for two years from the date this judgment became final and conclusive.

Reasons

Punishment of the crime

[Attachment] The Korea Electric Power Corporation planned to build the electric transmission lines of 90.5km and 161 electric transmission lines of the steel tower in size, including Ulsan-gun, Ulsan-gun, Yangyang-si, Yangyang-si, Yangyang-si, and Changju-si, for the purpose of transporting the power generation power generation of the electric power station and providing the stable electricity in the Yong-Nam-Nam area. The Korea Electric Power Corporation planned to build the electric transmission lines of 161 electric transmission lines of the steel tower around August 2008, and started construction works around August 2008. The “Styang-si Countermeasures against the construction of the electric transmission tower” consisting of around December 2005 was interfered with construction by actively holding a meeting to set

Due to the assembly of the committee and the occupation of the construction site of the committee for countermeasures against the above opposition, the construction of the transmission line has repeated the suspension and resumption of the construction, and the transmission line passing through the fast-si in 2014 has been completed.

On the other hand, the Korea Electric Power Corporation paid the amount of compensation equivalent to KRW 27 billion to 30 villages, under the name of the Korea Electric Power Corporation’s joint project cost, “village joint project cost” and “the legal subsidies on the local compensation and support around transmission and transformation facilities,” etc.

The “EFF was established on April 24, 201 for the purpose of the management of compensation in relation to the Korea Electric Power Transmission tower paid to F, and was established for the purpose of agriculture management and incidental business, etc., and the representative director is G, director B, H, I, and auditor.

【Criminal Facts】

Defendant

B, along with the above G, H, I, and J, and with the “village Joint Project Expense Subsidies” of the Korea Electric Power Corporation on April 21, 2014, the Defendant was kept in custody (five persons’ joint accounts, representative G) for the Victim E-Co-ownership Partnership (five persons), and Defendant A offered a proposal to the effect that “The seller shall pay KRW 300 million to the seller and the sales value shall be KRW 380 million,00,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,000,00

Accordingly, the Defendants jointly own the four lots of land located in the Cheongdo-gun, Cheongbuk-do-gun.