(영문) 서울중앙지방법원 2017.02.10 2016가단5003013
구상금
Text

1. The Defendant’s KRW 145,302,478 as well as 5% per annum from August 15, 2013 to February 10, 2017 to the Plaintiff.

Reasons

1. The following facts do not conflict between the parties, or can be acknowledged in full view of the following facts: Gap evidence 1-1-2, Gap evidence 2-2, Gap evidence 3-2, Gap evidence 5, Gap evidence 6-1-3 (the evidence Nos. 3 and 5 are included in the video) and Gap evidence Nos. 4-4.

The plaintiff is a company established for the purpose of non-life insurance business.

Belgium The Defendant owned and occupied the first factory (hereinafter referred to as the “Defendant factory”) in Nam-gu, Incheon (hereinafter referred to as the “Defendant factory”) as a corporation engaged in the manufacture of the heating board and the archature, painting, painting, etc.

Article 22(1) of the Civil Code No. 1 of the Civil Code No. 1 of the Civil Code No. 1 of the Civil Code No. 1 of the Civil Code No. 1 of the Civil Code No. 1 of the Republic of Korea

B. (i) Around October 2009, the Plaintiff entered into a business partnership insurance contract with C with the insurance period of the Plaintiff’s factory from October 7, 2009 to October 7, 2015, and with the insurance amount of KRW 500,000,000 (building 479,000,000, facility 21,000,000) (hereinafter “instant first insurance contract”).

B. On July 15, 201, the Plaintiff entered into a fire insurance contract with C with respect to the Plaintiff’s factory (hereinafter “instant insurance contract”) with the total insurance coverage period from July 15, 201 to July 16, 15, 2014, and KRW 1,290,000,000 (the total insurance coverage amount of KRW 760,000,000,000, and the facilities amount of KRW 200,000,00,000, and KRW 300,000,000,000).

C. (i) the occurrence of fire and damage (i.e., the Defendant factory consisted of one building consisting of two-story buildings in the steel framed roof in form. A fire inside the Defendant factory (hereinafter “instant fire”) occurred on January 9, 2013 (on January 9, 2013) and was damaged by 600 square meters, such as the first floor factory, warehouse, office, second floor office, restaurant, dormitory, etc.

Dor, due to the instant fire, forms immediately adjacent to the Defendant’s factory.