(영문) 인천지방법원 2017.05.23 2016가합51848
채무부존재확인
Text

1. The Plaintiff (Counterclaim Defendant)’s project to remove and dispose of the secondary waste in D and E districts in 2015 against the Defendant (Counterclaim Plaintiff).

Reasons

A principal lawsuit and a counterclaim shall be deemed simultaneously.

1. Basic facts

A. 1) The Defendant’s business of collecting floating waste coming from the Han River in the Han River in the Han River in the Han River or the Han River in the Han River in the Han River in the Han River, the Han River in the Han River, and the Dosung River in the G area (hereinafter “the business of collecting floating waste”) at H between the F area and the G area.

(2) The Defendant offered a bid on July 22, 2015 for a floating waste collection business in the year of 2015, and entered into a service contract with the following content (hereinafter “instant service contract”) on August 6, 2015, upon receiving a successful bid from the Plaintiff Co., Ltd. (hereinafter “A”) and the Plaintiff Co., Ltd. (hereinafter “A”) and the Plaintiff’s operating, around August 6, 2015.

The instant service agreement between the Plaintiffs and the Defendant on August 7, 2015, from August 7, 2015 to November 24, 2015, IDD 192,837,500 for the service contract at the location of the company, and between the Plaintiffs and the Defendant, the following design specifications and special specifications (hereinafter “instant design specifications and special specifications”).

(ii)be attached. The main project contents of the snow lighting include removal of wastes from floating debris to floating debris (7-12 months, installation of floating debris to H E area adjusted depending on weather conditions, removal of floating waste to land, loading and unloading and removal of floating debris to the entrusted disposal of oil, such as removal of mooring facilities, and removal of floating debris to the entrusted disposal of oil;

4. The term "recovering process" means a process for the removal of floating waste to the floating bridge, mooring Schedule, and mooring facilities, for the removal of floating waste and mooring facilities to the designated place after the removal of floating waste and then return and keeping them to the designated place;

Other

1.The Project shall be implemented in accordance with the project plans, general specifications and special specifications, and the other administrative matters shall be directed by the ordering authority.

Removal and removal of the 2-5 floating debris from each special time;

2. To preserve, transport, and handle materials so that they can be used without any separate repair when they resume work in the following year;