logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 춘천지방법원 원주지원 2017.06.08 2016고단479
국토의계획및이용에관한법률위반등
Text

1. Defendant A shall be punished by a fine of KRW 50 million.

Defendant

A does not pay the above fine.

Reasons

Punishment of the crime

Defendant

On July 16, 2014, A was sentenced to imprisonment with prison labor for a crime of fraud, for a period of one year, for a suspended sentence of two years, and for a judgment on July 24, 2014. On April 19, 2016, the same court was sentenced to imprisonment with prison labor for a year, for a suspended sentence of two years, and for a fine of five million won for the same crime, and the judgment on April 27, 2016 became final and conclusive.

"2016 Highest 479"

1. The Defendants, who committed the joint crime from the end of July 2014 to August 1, 2014, had been engaged in development activities on the 2,97 square meters of H forest in Haju, and filed a civil petition on the grounds that the soil of neighboring residents occurred. As such, the Defendants were willing to install illegal structures, such as reinforced soil retaining walls, without obtaining permission for the development activities of the main market in the above development area and its neighboring areas.

A. The Defendants conspired, from the end of July 2014 to August 20 of the same year, installed a reinforced soil retaining wall of a size of 41.4m in length and of a height of 1 to 2m above 364m in forests and fields for which no permission for development was obtained among the above H forests and fields from the end of the same year, and changed the form and quality of land without obtaining permission for the original market.

B. In collusion, from the end of July 2014 to August 201 of the same year, the Defendants installed a reinforced retaining wall of a size of 112.5m in length on the 4 lots of land, such as Won-si, J, K, L, etc., and performed embling and shoting operations using the digging cirls, and changed the form and quality of the land without obtaining permission from the original market.

(c)

Defendants conspired, and the “2016....” recorded in the 2014 official complaint is clear that the “2016......” is a clerical error in the “2014.......”

7. From the end of the same year to the end of August of the same year, unlike the content of permission for development activities regarding 2,97 square meters of the above H forest, a reinforced soil retaining wall with a height of 41.4 meters and a height of 1 to 2 meters is installed at the entrance part of the access road. The construction of a double site on the above land, and the construction of a double-site site at the length of 127.5 meters and 0.5 meters at height of 0.5 meters, permission for the original market is granted.

arrow