logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원 2015.05.21 2014가합51889
구상금
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff related to the parties is a legal entity that performs duties such as compensating for any occupational accident caused by workers who are entrusted with the industrial accident compensation insurance business by the Minister of Employment and Labor. A is the owner of C (hereinafter “instant complaint vehicle”). The Defendant is the insurer that entered into a comprehensive motor vehicle insurance contract with A as to the instant complaint vehicle.

B. Work execution of glass installation works under a contract for construction works 1) A company for a stock company (hereinafter “Korean company”).

Around May 2007, 2007, the Construction of Principal tin General Co., Ltd. (hereinafter referred to as “main tin Construction”).

(D) the sample house in Sacheon City (hereinafter referred to as the “Sample house”)

) Free installation works among new construction works (hereinafter referred to as “instant construction works”)

2) Around March 1, 2007, the K-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing-Wing, the K-Wing-Wing-Wing, the K-Wing-Wing-Wing, the K-Wing-Wing, the K-Wing,

C. On May 1, 2007, E obtained Class 1 driver's license for the instant accident, and six days after obtaining the license.

7. At around 18:00, at the site of the instant construction, 600 cm wide, 950 cm high, 20 cm high, which is about 60 cm thick, operated the said accusation vehicle in a way that the equipment was loaded in the work unit of the instant accusation vehicle and operated by radio stude, and F was on board the said work unit and installed glass on the right side side of the entrance of the sample house at a height of approximately 4 meters above ground.

2 E, while conducting the above glass installation work, is close to the wall of the model house.

arrow