logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 부산지방법원동부지원 2019.02.15 2017가단218231
손해배상(산)
Text

1. The Defendant: KRW 130,411,354 to Plaintiff A; KRW 10,000 to Plaintiff B; KRW 3 million to Plaintiff C and D, respectively.

Reasons

1. Basic facts

A. On July 5, 2016, the Defendant was a corporation that runs business of reinforced concrete construction works, water supply and sewerage construction works, maintenance and management of facilities, etc., and was awarded a contract with the Office of Education of Busan Metropolitan City for the project of improving toilets at FII (hereinafter “instant construction”).

B. On July 24, 2016, Plaintiff A: (a) removed intermediate walls from a brine onto the brine onto the brine onto the brine onto two workers; (b) discharged concrete residues into a safety plate installed on the outer wall of the 4th floor window, along with other two workers.

However, at around 13:40 on the same day, in the middle wall upper part of the middle wall where the Hadryth functional hole was removed, approximately approximately 300-400 km of concrete, and there was shocking around the right blus of Plaintiff A, who performed the work of collecting residues from the middle wall at a distance of 1m from the middle wall.

(hereinafter referred to as “instant accident”). C.

In the instant case, Plaintiff A suffered bodily injury, such as the cutting of the right-hand part, the upper right-hand part flag, the upper right-hand part flaging, the spawning, the impairment of eulogy, the impairment of eustice, the impairment of eustice, the impairment of euthane 1, the pressure frame of the mastal part 1, the pressure frame of the mastalle, the mastal part in the right-hand part, the damage of the side in the right-hand part, the damage of the right-hand part in the upper right-hand part.

Plaintiff

B The spouse, the plaintiff C, and D of the plaintiff are children.

E. Plaintiff A received hospital treatment from July 24, 2016 to November 28, 2016 due to the instant accident, and from November 28, 2016 to April 17, 2017, Plaintiff A received hospital treatment.

F. From July 24, 2016 to April 17, 2017, Plaintiff A received temporary layoff benefits of KRW 13,714,320, medical care benefits of KRW 24,592,130, during the period from July 24, 2016 to April 17, 2017, and received disability benefits of KRW 1155, calculated as average wage of KRW 75,861, in the form of pension.

G. From July 2016 to 25th day of each month, the National Pension Service paid pension to Plaintiff A, and from April 25, 2017, this case.

arrow