Text
1. The Defendant’s KRW 5,420,00 for the Plaintiff and KRW 5% per annum from November 24, 2015 to December 7, 2016.
Reasons
1. The fact that there exists no dispute or dispute);
A. The Plaintiff cultivated sexual harassment trees on the 2,429 square meters (hereinafter referred to as “instant land”) of Jeonyang-gun, Jeonyang-gun, his own ownership.
B. The Defendant, including the above land, was designated as a business entity for the creation of D in the Category C, and became a foundation for the creation of the foundation from March 2013.
2. Determination
A. On February 15, 2009, the Plaintiff asserted that 5,980 sexual harassment trees were raised on the instant land.
From March 2013, the Defendant, while carrying out the infrastructure construction, made the instant land relatively lower by raising soil on the land adjacent to the instant land (hereinafter referred to as the “reclaimed land”), and did not install an adequate drainage channel.
The defendant newly constructed a water channel in the vicinity of the existing drainage route and added it to the land of this case on a temporary basis.
For this reason, 3,60 out of balone trees, which were planted in the instant land while rainwater flows into the instant land in the mountain and August 2013, 2014, was dead or destroyed.
Therefore, the defendant is obligated to compensate the plaintiff for KRW 73,200,000 ( KRW 3,660 x KRW 20,000 per share).
B. Determination 1) In full view of the fact-finding inquiry reply of Gap 3, 4, 9, 12 through 16, Eul 3 and 7, and the fact-finding inquiry inquiry inquiry inquiry reply by the Grand Appraisal Co., Ltd., the defendant performed an infrastructure construction project since March 2013, and the defendant is the land adjacent to the land of this case (hereinafter referred to as the "refusal land").
The lower part of the land of this case has increased soil. The lower part of the land of this case has produced relatively low prices for the land of this case; the Defendant did not properly install drainage facilities for the construction process; the fact that earth and sand flowing into the construction process has been partially flowing into the land of this case; the 17th day in July, 2014; the 62m in the 17th day in the 19th day; the 57.5m in the 19th day; the 27m in the 28th day; the 20th day in the 20th day; the 120m in the 17th day; the 71.5m in the 18th day; the 58.5m in the 25th day; and the 58.5m in the 25th day in the 20th day in the 20th day.