(영문) 대전고등법원 2019.08.29 2019나10710
손해배상(기)
Text

1. The plaintiff (Counterclaim defendant)'s appeal is dismissed.

2. The costs of appeal shall be borne by the Plaintiff (Counterclaim Defendant).

purport, purport, and.

Reasons

1. Basic facts

A. The Plaintiff is the owner of the D P PPcar (hereinafter “instant PPcar”) and the person operating the instant PPcar. Nonparty E is the person employed to receive the Plaintiff’s punishment and driving the instant PPcar.

The defendant is a company that engages in the manufacture, processing, etc. of construction equipment and parts.

B. On October 2016, the pumps of this case were repaired to the Defendant, from October 13, 2016 to November 17, 2016, for the parts of booming booming (of course, approximately 8 to 10 meters long, which consist of about 5 parts of a passage at the time of launching booming from the ground to the place of boarding, and which are produced so that they can work like a booming pipe). The parts of the booming part of the booming part of the booming part of the booming part were cut off, and the booming part of the 4th part was completed.

C. On January 14, 2017, the Plaintiff entered into a contract with Nonparty C (hereinafter “C”) for the lease of pumps, and on January 14, 2017, upon entering into a contract with FF Co., Ltd. for the construction of reinforced concrete parts, the Plaintiff, at the construction site of GJ, allowed E to drive the pumps of this case and perform concrete building works.

The booms (the booms are installed and released from pumps manufacturers, and the booms are also used by connecting to the booms when the booms are not in contact with a concrete place) are booms (the booms are installed and released by being installed at the pumps manufacturer) and the booms are operated with 5 joints of the booms on the ground and nearly horizontally, and the booms are cut off at around 13:00 on the same day, and there was an accident that the booms after the booms are cut off to the booms that were repaired at the previous level at around 13:00 on the same day.

(hereinafter “instant accident”). D.

On February 20, 2017, the Plaintiff intended to repair the pumps of this case to I Co., Ltd., Ltd. (hereinafter “I”).