Text
1. The plaintiffs' claims against the defendants are all dismissed.
2. The costs of lawsuit are assessed against the plaintiffs.
Reasons
1. Basic facts
A. (1) The status of the party concerned (1) Defendant A Si owns D camping ground located in C (hereinafter “instant camping ground”), and Defendant B Co., Ltd. (hereinafter “Defendant B”) is running a professional camping ground business, and around March 2014, Defendant A leased the instant camping ground from Defendant A Si to use it as a professional camping ground.
(2) The Plaintiffs are the occupants who reside in the instant apartment or are currently residing in the instant apartment at the corresponding date indicated in the same list of E Apartments (hereinafter “instant apartment”) on each corresponding date indicated in the attached list 3 as “the date of commencement of occupancy.” The Plaintiffs are the occupants who reside in the instant apartment or are currently residing in the instant apartment at the corresponding date indicated in the same list as “the date of completion of occupancy.”
B. The present status and utilization status of the camping ground of this case and the apartment of this case were formed on the ground of G around September 1965 in the field of the camping ground of this case and the present status of the apartment of this case (1) the camping ground of this case was formed on the ground of G around September 1965. It was composed of a large number of stadiums, such as the main stadium, camping ground of this case (hereinafter “H camping ground”), indoor swimming pool, indoor swimming pool, Yang-gu, Taekwondo ground, and indoor gymnasiums.
(B) Defendant A removed the stadium’s main stadium around 201, and around March 2014, Defendant A newly built the instant camping ground of the size of 22,401 square meters in the building area, 22,401.01 square meters in that place, 5 stories above ground, 22,000 seats, and 27,000 maximum accommodation capacity.
The number of professional camping games held from March 2014 to March 2014 at the night (17:0 or 18:30) at the 15 match 70 match 15 match 15 match 70 match 2015 match 2015 and 118:3 at the 64 match 65 match 183 match 228 match 228 at the 183 match 183 match 183 match 2016. (C) at the 15 match 15 match 70 match 2015, the number of professional camping games held from March 2014 to 2016 is as follows.
(D) The camping ground of this case is installed with a sound facility of 220 spackers, and 312 lighting equipment.