(영문) 서울행정법원 2015.11.12 2014구합52206
보상금증액
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

(a) Business authorization and public notice - Electric Power Resource Development Business (D transmission line construction business; hereinafter “instant business”): Defendant - Public notice given to the Ministry of Knowledge Economy on September 13, 2010, and the Ministry of Knowledge Economy on April 3, 2012;

B. 1) Plaintiff A- The date of concluding a superficies contract between the Plaintiffs and the Defendant: The scope of creation of superficies on June 20, 201: The scope of creation of superficies: 658 square meters per annum (hereinafter “instant land”) prior to the Dong-gu, Chungcheongnam-gu, Seoul Special Metropolitan City owned by the Plaintiff.

(ii) means the land excluding the land of support from among the land directly under the boundary of 129 square meters in the southwest and southwest and across the power transmission line, plus three square meters in horizontal length from both uppermost lines of the power transmission line;

(A) A public space of not less than 22m but not more than 61m in the earth surface of not less than 175m2 (However, in the cadastral map of the attached Form 1, the area of not less than 3m2 is not a steel site, but a superficies contract was concluded by treating it as a steel site in consideration of its form,

- Land rents: 55,085,250 square meters (129 square meters in a steel tower: 39,151,500 square meters in a steel tower: 15,93,750 square meters in a line: 175 square meters in a line: 15,93,750 square meters in a line: 2) Plaintiff B (hereinafter “Plaintiff B”) during the period from the date of conclusion of the contract to the duration of the superficies: The date of conclusion of the contract: April 21, 201; - The scope of creation of superficies: 91,607 square meters in the south-dong-gu, Seoul Special Metropolitan City (hereinafter “instant 2 land”): The south of the land owned by the Plaintiff from the date of conclusion of the contract to the date of conclusion of the contract; 5,93,750 square meters in a place of public space of not less than 15,000 square meters but not more than 67 meters in a line of public space; 208,1608,6969,60,500.

- The date of concluding a contract: - The scope of superficies creation on April 21, 201: - Of the Plaintiff’s species C: 14,974 square meters of I forest land in Dong-gu, Nam-gu, Seoul (hereinafter “instant three land”) and is the same as the instant land 1 and 2.