(영문) 서울고등법원 2020.05.29 2017누38043
월성1호기수명연장을위한운영변경허가처분무효확인등
Text

1. The judgment of the court of first instance is modified as follows.

All lawsuits concerning the main and ancillary claims of the instant case are brought.

Reasons

1. Details of the disposition;

A. 1) The plaintiffs are the parties and interested parties 1) The monthly nuclear power plant 1stm (hereinafter referred to as "monthly 1m) located in both south and south of the Republic of Korea at the time of racing.

A) A citizen of the Republic of Korea is a citizen of the Republic of Korea who resides in a nearby area subject to radiation impact assessment under the Nuclear Safety Act. 2) The Defendant is the Act on the Establishment and Operation of the Nuclear Safety and Security Commission (hereinafter “original illegality”).

(i)a central administrative agency belonging to the Prime Minister established to carry out functions concerning nuclear safety in accordance with Article 3 of the Nuclear Safety Act, which holds the authority to permit the operation of a nuclear power reactor and relevant facilities, to modify the operation thereof, in accordance with Article

3) The Korea Institute of Nuclear Safety (KINS) shall be subject to the NAFety, hereinafter referred to as the “KINS”).

A) A specialized institution for safety regulation established pursuant to the Korea Institute of Nuclear Safety Act is entrusted with the safety review authority with regard to permission for the operation of a nuclear power reactor and relevant facilities and permission for the alteration of operation thereof, etc., in accordance with Article 111(1) of the Nuclear Safety Act and Article 6 of the Korea Institute of Nuclear Safety Act. B. The monthly period of No. 1 of the instant disposition with regard to the monthly period of No. 1 was the site creation on May 3, 197, and the construction and operation permission was obtained on February 15, 1978, and the first period of design life was commenced on November 21, 1982, and the commercial operation commenced on April 22, 1983.

Frisung 2, 3, and 4, including monthly 1, are used for the cold cooling and hot water (Heeavy Wster) designed by the Canadian Atomic Energy Corporation (AECL), and the pressure is used to prevent the heavy water of the coolant from putting it into high temperature.

A nuclear power plant that is a kind of nuclear power plant in the nuclear power plant, the type of cans (CNDU) of nuclear power plant.

2) The Intervenor operating the Defendant Litigation Intervenor No. 1 (hereinafter “ Intervenor”)

on November 20, 2012, 30 years have elapsed since the 30th anniversary of the name of design.