logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2017.11.29 2017가합528955
양수도대금 청구의 독촉사건
Text

1. The Defendant’s KRW 600,000,000 as well as annual 6% from January 3, 2017 to March 31, 2017 to the Plaintiff.

Reasons

1. Basic facts

A. C (hereinafter referred to as “C parent company”) of the C parent company holding and operating the instant business right is a parent company holding 100% of the U.S. corporation D (hereinafter referred to as “C 1 subsidiary”) and U.S. corporation E (E; hereinafter referred to as “E”)’s shares.

C 제1, 2 자회사는 각 미국 버지니아주 노스햄튼 카운티와 클라크 카운티에서 태양광 발전사업(이하 위 각 사업을 통칭하여 ‘이 사건 사업’이라 한다)에 관한 인허가를 받고, 이 사건 사업을 운영하고 있다.

C On October 1, 2012, the second subsidiary Co., Ltd. entered into a contract to lease the pertinent land from G, the owner of the land located in the U.S. Buran Fitan Fitani (hereinafter referred to as “contract”) in the instant project site.

C 제1 자회사는 2013. 1. 16. 이 사건 사업부지 중 미국 버지니아주 노스햄튼 카운티 H 동남부에 있는 토지 약 185 에이커의 소유자인 I로부터 위 토지를 매수하기로 하는 계약(이하 ‘제② 계약’이라 한다)을 체결하였다.

C On November 5, 2015, subsidiaries C 1 and 2 concluded electric power purchase agreements between J (J, hereinafter referred to as the “J”), a U.S. cooperative that produces and transmits each electricity on November 5, 2015, under which Co. 1 and 2 supply electricity produced by solar power generation, and the J shall pay the cost to J (hereinafter referred to as “Purow Purchase Agreements between Co., Ltd. and J”) ③, and under which Co. 2 and Co., Ltd. enter into a contract between Co. 1 and J (hereinafter referred to as “Power Purchase Agreements”).

C On March 2, 2016, Co., Ltd., a U.S. cooperative, entered into a contract between Labyactricccal Co., Ltd. (hereinafter referred to as “Lacn contract”) between Lacn and Lack’s Co., Ltd. (hereinafter referred to as “Lacn”) under which Co., Ltd. (hereinafter referred to as “C”) receives power lines from Lacnck Lack’s Lack’s Laccccck.

C The first subsidiary shall be June 10, 2016.

arrow