logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2019.11.14 2019구합60302
감봉처분취소
Text

1. The plaintiff's claim is dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

. Details of the disposition; and

A. On July 1, 1997, the Plaintiff was in the Army as Second Lieutenant, and thereafter, from October 25, 2016, to October 25, 2016, the Army B Group C (hereinafter “B Group”) affiliated with the Gangwon Iron Group (hereinafter “C Joint and Several”), and was promoted to the Second Lieutenant on November 1, 2016.

B. Sub-Decree E, the director of the D major operations division, prepared the “D Major”) 2017 M&D M&D plan for the latter part of the 2017 M&D (hereinafter “instant M&D plan”) and obtained approval from the Director of C’s Joint and Several Association on September 21, 2017 after the Plaintiff’s review. The main contents of the instant plan for the M&D are as follows.

In the Flater, the mission unit shall be:

9.(25.(29.(gold)-29.(gold)/10.23(23.27.(gold)-27.(gold)-2-2-2-2-2-2-2-2-2-2-2-2-3-3-3-3-3-466-2-3-3-4

- Do Governors of the Implementation Unit - Maintenance at the Level A (on the present level B) of the Jin Site after the Jin Site Construction - Execution of the Jin Site Construction : Construction of a wire unit and construction of a Jin Site under the order of priority in partial supplementation - Construction of a Jin Site: <1> Construction of a gun unit : Construction of a G G, Jin Site 3 Construction of a fire unit : Reinforcement and construction of a Jind coal treatment unit - The reinforcement and construction of a Jind coal treatment unit - The Jindle for the major fire equipment to be used between combat (Utilization of the mast, Ginseng, etc.) - The installation and repair (use of a oil pipeline) to be capable of performing the functions of a water-

C. B (hereinafter “Information and Communications Network”) planned shooting training as a shooting concentration from September 25, 2017 to September 29, 2017. From September 14:15, 2017, H shooting range (hereinafter “I shooting range”) was set up in the Information and Communications Network, 84 persons (75 persons for information and communications, 9 persons for stage of B) under the control of the Captain J in the radio department commander of the Information and Communications Network (hereinafter “instant shooting range”) were set up as 14 persons for 84 persons (6 persons for 75 persons for information and communications, and 9 persons for stage of B).

D. 1. '1.......................

The second Chief K. K. . of the second Chief.

arrow