(영문) 부산지방법원동부지원 2014.09.18 2013가합1388
용역비
Text

1. The Defendant’s KRW 375,302,566 as well as 6% per annum from February 27, 2014 to September 18, 2014 to the Plaintiff.

Reasons

1. Basic facts

A. The plaintiff is a corporation established for the purpose of the construction design business, etc., and the defendant is a housing reconstruction and improvement project association established under the Act on the Maintenance and Improvement of Urban Areas and Dwelling Conditions for Residents (hereinafter "Urban Improvement Act").

B. 1) The owner of the luminous Manman Apartment apartment located in 187-2, 2003, 187-2, 2006, on April 3, 2006, the housing reconstruction project in which the project implementation district is the 6,390.1 square meters of the above land (hereinafter “instant reconstruction project”).

For the purpose of this section, the Committee for the Establishment of Minean Housing Reconstruction Project Association consisting of its owners (hereinafter referred to as “instant Promotion Committee”).

(2) On May 16, 2008, the Plaintiff concluded a design service contract for the instant reconstruction project with the Promotion Committee on May 16, 2006, and concluded a design service contract for the instant reconstruction project (hereinafter “instant service contract”) with the Defendant on September 8, 2008.

The contents of the instant service contract related to the instant case are as follows.

◎ 이 사건 용역계약

1. Design contract title: Mining or drawing up housing reconstruction project;

2. Location of a building site: Manalan-dong 2, 187-2, Busan Suwon-gu.

3. A design outline 1) Site area: The number of floors for multi-unit houses and ancillary facilities 3): The total floor area of 4 stories underground and 29 stories above ground: 15,914 square meters (Provided, That the area of final business authorization shall be the area of 15,914 square meters (the area of multi-unit houses and ancillary facilities 4);

A person shall be appointed.

4. Contract amount: It shall be calculated by calculating the unit price per square meter on the basis of the total floor area of the building with a daily gold-gu, 000 won/ square meters (excluding value-added tax), based on the final area finalized at the

Article 3 (Scope of Services) (1) The scope of services provided by the Plaintiff to the Defendant shall include the planning and design drawings, the basic design drawings, the interim design drawings, the shop design drawings, and other plans for construction of buildings.