(영문) 창원지방법원 통영지원 2018.04.30 2018고정75
사문서위조등
Text

Defendant shall be punished by a fine of KRW 5,000,000.

When the defendant does not pay the above fine, 100,000 won.

Reasons

Punishment of the crime

[criminal record] On March 23, 2017, the Defendant was sentenced to two years of imprisonment with prison labor for a violation of the Act on the Protection of Defense, etc. at the Busan High Court, and the above judgment became final and conclusive on March 31, 2017.

[2] The facts constituting the crime are those who were actually the actual representative of E, who received the supply of the installation and dismantling of the rain at the site of D redevelopment removal works which C received, and the defendant A was working for the company C as the site of D redevelopment removal works.

1. The forgery B of a private document seeks to lease the temporary materials to be used at the above construction site from F representative G. However, while G received a demand for joint and several sureties from G, the Defendant, the head of the site, requested the joint and several sureties’s joint and several sureties.

The defendant did not obtain permission from C, and expressed that B had talk about the female employees of CM's office, so that he would buy the corporate seal.

B On January 20, 2012, at the CM office located in P of Busan Metropolitan City, the head of the corporation from the female employee I who was contacted with the Defendant A, the head of the site site in advance at the CM office, and the F representative G and material lease contract at that place, set up the F representative G and material lease contract, and entered the name and address of C and the representative J in the joint and several guarantor column, affixed the name and the head of the corporation next to it, and signed it.

Accordingly, the defendant, with the intention of exercising the right and duty of the corporation C through B, forged the temporary material lease contract, which is a private document for the rights and duties of the corporation corporation, without authority.

2. The Defendant at the time and place specified in Section 1 through B, which misleads that he/she obtained the consent of Section C, issued a forged temporary material lease contract to F Representative G, Inc., a temporary material lessor, as if it were duly formed.