1. The Plaintiff:

A. Defendant A is jointly and severally and severally with Defendant B, and as to KRW 1310,31,31 and its KRW 77,189,246 among them, June 2016.

Reasons

1. Basic facts

A. On December 30, 2010, Defendant A borrowed KRW 430,00,00 from the Gyeonggi Mutual Savings Bank (hereinafter “the first loan”) and KRW 390,00,000 (hereinafter “the second loan”) at each interest rate of KRW 11%, interest rate of KRW 23%, interest rate of KRW 20,000, and due date of payment on June 30, 201. Defendant B guaranteed the first loan obligations within the limit of KRW 546,00,00, KRW 509,60,000, respectively.

B. On September 29, 201, the Plaintiff against Defendant A of Gyeonggi Mutual Savings Bank.

Each claim described in the subsection was taken over.

C. On March 27, 2012, the Plaintiff received KRW 187,134,770 from the public auction procedure for the real estate owned by Defendant B (Seoul), and appropriated it for the principal of the second loan. On May 22, 2012, the Plaintiff received KRW 289,98,373 in the distribution procedure for the real estate rental auction case against the 701m2, 701m2, 701, 701, 701, 700, 700, 2012, and appropriated KRW 14,127,325 for the principal of the first loan. On June 12, 2013, the Plaintiff received additional KRW 12,82,381, the remainder of the principal paid after deducting KRW 1,304,94, from the principal of the auction case, and appropriated it for the principal of the loan in the above auction procedure.

[Grounds for recognition] The entry of Gap evidence Nos. 1 through 15 and the purport of the whole pleadings

2.The result of the calculation of the principal and interest of the loans as stated in the basis of the determination is as follows:

The first loan shall be 23,714,794, 794, 430,000, 430,000-12-30, 2011-06-30 183, 2014, 794, 430,000, 007-01-07-1 201-09-28 203% 24,386, 301-430, 430,000, 201-29-29-29-201, 205-2363% of the principal and interest or delay damages, 2363% of the total of 63,946, 140, 011, 627-205, 205-146, 208-136, 208-1364, 206, 208-1636