logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 마산지원 2019.03.13 2019고단60
절도등
Text

A defendant shall be punished by imprisonment for not more than ten months.

Seized evidence1 through 6 shall be confiscated from the accused.

Reasons

Punishment of the crime

[Criminal Power] On March 4, 2016, the Defendant was sentenced to one year and six months of imprisonment for habitual larceny in the Daegu District Court, and completed the execution of the sentence in the Daegu Prison on June 26, 2017.

【Criminal Facts】

In order to raise living expenses, the Defendant intruded into an empty factory located in a remote area, brought the electric wires installed therein well to enter the bus for the purpose of selling them on the water, and d's empty factory operation managed by the victim C in the Haban-gun B while displaying the object of the crime, and tried to steal the electric wires of the above factory.

1. On December 21, 2018, the Defendant: (a) from around 15:00 to around 17:00 on December 21, 2018, 2018 to around 17:00, the Defendant prepared a cable cable (2 cm) of 4m in length (16m in total length) connected to the upper part of the distribution board connected to the upper part of the distribution board behind the factory operation at the above Company B factory operation from around 15:0 on December 21, 2018; and (b) deducted it from the saw that he prepared for 4m cable (16m in length) in advance; and (c) transferred the said 4m among the above 4m joints to the lower part of the C factory operation; and (d) divided the remainder into approximately 40m unit with the said saw 20m unit.

After that, the Defendant exceeded the clothes of the above cable on the market price, which was divided into 20 knife with the knife that was prepared in advance, and took them back into the back.

2. On December 31, 2018, the Defendant: (a) from around 15:00 to around 17:00 on December 31, 2018, 2018 to around 17:00, the Defendant divided the cable cable (2cm) 2 in the length of 4m (8m in total length) transferred, as described in paragraph (1), from the behind the operation of the factory of the said company from around 15:0 to around 17:00, into the hacksaw, approximately 40cm, and divided the two.

After that, the Defendant exceeded the clothes of the above cable on the market price, which was divided into 20 knife with the knife that was prepared in advance, and took them back into the back.

3. On January 7, 2019, the Defendant, from January 15, 2019 to January 17, 2019, opened a power distribution board located adjacent to the said C factory Dong from the smoking tower located adjacent to the said C factory Dong and installed inside the inside. 4 meters.

arrow