(영문) 대전고등법원(청주) 2020.05.20 2019나3449
임대료 및 부동산 인도 등 청구의 소
Text

1. The defendant (Counterclaim plaintiff)'s appeal is dismissed.

2. The costs of appeal are assessed against the Defendant-Counterclaim Plaintiff.

purport, purport, and.

Reasons

1. The reasoning of the judgment of the court of first instance cited the same reasoning as the reasoning of the judgment of the court of first instance, except for cases where the reasoning of the court of first instance is written or added as follows.

2. Parts used or added;

(a) add “a factory” at the bottom of 3 pages, “a building area” and “a building area” to 72.18 square meters connected to two factories (a connecting part wall shall be open).

나. 4면 하단 3~5행 “라. 이후 원고들은 변경하여 신청하였다.”를 아래 『』내용으로 고쳐 쓰고, 4면 하단 2행 “이에 대해”를 “위 사용승인 신청에 대해”로 고쳐 쓴다.

“Along with the content of the instant application for the change, the Plaintiffs delivered the instant building to the Defendant on January 24, 2017, and applied for the approval of use on March 22, 2017. Meanwhile, the Defendant, upon delivery of the instant building, performed construction necessary for using it as a pet animal feed manufacturing plant, started to operate the factory by installing machinery and equipment, and around that time, built a temporary building of 88.76mm2, which is a panel structure, with the instant building extended (a size of 165m2) and 88.76m2, which is a panel structure.”

(c) At the end of the five pages 1, the following table shall be added to the following table at the end of the first parallel, and between five pages 1 and two:

- A certificate of quality of fireproof structure - A certificate of quality of fireproof structure - A certificate of quality of a building should comply with the heat control standards or the standard of thickness of a stoves under Article 2(1) of the Energy-Saving Design Standards depending on a change in a ground plan or elevation plan. As such, the relevant documents are submitted pursuant to Article 10 of the Enforcement Decree of the Green Buildings Construction Support Act following a change in a ground plan or elevation plan, and the submission of relevant documents - Article 4