(영문) 서울중앙지방법원 2014.06.03 2013가단250615
구상금
Text

1. As to the Plaintiff KRW 39,975,255 and KRW 24,882,85 among them, the Defendant shall pay to the Plaintiff KRW 2,400 from June 26, 2013.

Reasons

1.The following facts may be found either in dispute between the parties or in combination with the purpose of all pleadings on each entry or image of evidence A(1) to 6.

A, around 20:05 on March 31, 2013, driving a tourist bus belonging to the Sung-do Speed Tourism Co., Ltd. (hereinafter referred to as “first vehicle”) and standing on the side of the bus at the distance of 173.2 km from the rear side of the bus, which is the two-lane north-do west-gun, located in the south-do west-gun, the direction of the postponement and emergency, etc., and stopped on the side with a width of about 3.2 meters. On the left side of the left side of the road, one of the two-lanes was in a state of rhhym, and there was no night, street, etc., and thus, the visible distance of the follow-up vehicles could not be secured due to the postponement.

Afterward, C driving a J Passenger Bus Co., Ltd. (hereinafter “Second Vehicle”) with passengers D, E, F, G, H, H, and I on board, and the J Passenger Co., Ltd. (hereinafter “Second Vehicle”) was found later, the first vehicle was found later, the left-hand corner part of the first vehicle was shocked, and stopped on two-lanes in the front right-hand side, and accordingly, the passenger K, etc. was aboard and the passenger bus belonging to the light Passenger Co., Ltd. (hereinafter “third vehicle”) did not find the second vehicle in advance without securing a safe distance. Accordingly, the part of the second vehicle was d, E, F, G, H, I, and K suffered from each injury.

(hereinafter “instant accident.” As to the instant accident, the Plaintiff was a mutual aid business entity that entered into a mutual aid agreement with the second and third vehicles for each mutual aid contract, and the Plaintiff was KRW 7,010,650 to D until May 29, 2013 (i.e., treatment costs of KRW 4,297,650) (i.e., treatment costs of KRW 2,713,00), and KRW 4,430,620 to E until May 30, 2013 (i.e., treatment costs of KRW 1,896,860,860, KRW 2,53,760), and KRW 9,155,60 to F until May 31, 2013 (i.e., treatment costs of KRW 5,65, KRW 600, KRW 3,500,00), and KRW 2,738,284,2085,2858