(영문) 수원지방법원성남지원 2015.11.24 2014가합204280
손해배상(기)
Text

1. Defendant B Co., Ltd.: (a) KRW 204,045,533 as well as 5% per annum from November 17, 2013 to November 24, 2015 to the Plaintiff.

Reasons

1. Facts of recognition;

A. Defendant C owns three single-story stables in the steel-frame prefabricatedglllllls and one-storys on the two lots of land C and E.

B. On March 21, 2005, the Plaintiff leased from Defendant C the “(A) Building” among the three said cattle sheds, and used it as a storage for inventory goods. The Plaintiff used it as a storage for inventory goods.

C. On April 10, 2007, Defendant B Co., Ltd. (hereinafter “Defendant Company”) leased the “B building” (hereinafter “B building”) among the said three livestock penss from Defendant C to use it as the office of the Defendant Company and the place of display of Korean musical instruments, and constructed a provisional building between one building and two buildings (hereinafter “instant provisional building”) for the purpose of manufacturing Korean musical instruments.

On November 16, 2013, around 18:55 on November 16, 2013, a fire occurred inside the building of this case, and most of the interior and roof of the building of this case are destroyed by fire, and the inventory goods owned by the Plaintiff inside the building of this case, which are destroyed by fire, were destroyed by fire, or become unusable by fire.

(hereinafter “instant fire”). E.

The initial Findingr of the instant fire in 100 and 2 reported to the 119th, and the Hanam fire fighting unit investigating the fire site was all excluded from the possibility of fire prevention, the possibility of incidentalism, and the mechanical causes, and as a result of finding a part presumed to have been exposed to the launching point of the instant building, it is presumed that the pressure breaking damage of the multi-modal cable installed on the floor surface of the instant building was discovered and damage was discovered in many parts of the instant building, and that the spke, which occurred on the half line of the multi-modal, was loaded into a large quantity of fire fighting unit scattered into the floor and burned it. In conclusion, “related persons”.