(영문) 대전지방법원 서산지원 2017.11.24 2016고단105
사기
Text

A defendant shall be punished by imprisonment for not more than ten months.

Reasons

Punishment of the crime

On June 19, 2015, the Defendant was sentenced to a suspended sentence of three years for fraud at the Seosan Branch of the Daejeon District Court on one year and six months, and the said judgment became final and conclusive on January 30, 2016.

"2016 Highest 105"

1. On January 23, 2014, the Defendant: (a) at the Jin-si building B; (b) the Defendant’s office operated by the Defendant (State); (c) at the victim E’s office, the Defendant would create an industrial complex on the backside of the F J Jin-si and Songak-si; and (d) G would create the industrial complex on the backside of the P Jin-si and Songak-si; and (c) at the (ju) where the basic civil engineering works in the two construction sites are performed.

In March 20, 2014, two projects will begin from around March 20, 2014, and the number of workers at the construction site will be the white name.

B. The phrase “to provide food materials exclusively to a restaurant and to fix the rate of 50 million won at 18%” was false, which will be operated at the construction site at the site of a week at the site of a week.

However, the defendant did not actually receive the above basic civil engineering works, and even if he received KRW 50 million from the injured party as a security deposit, he thought it to be used for the repayment of personal debt, etc., but did not have the victim's intent or ability to supply food materials to the restaurant as a box in the construction site.

The Defendant, as such, by deceiving the victim, received KRW 50 million from the victim under the name of the same day from the victim, to the H account (Account Number I) in the name of the Defendant.

"2016 Highest 142"

2. On April 6, 2015, the Defendant was entrusted with F&D reclamation works from the Victim J (State) Department at the J’s (State) building B, and (State) D office operated by the Defendant under subparagraph C, and the Defendant was entrusted with F/D reclamation works from this K.

L The term “a request for a contract deposit for the reduction of subcontracted construction amounting to KRW 30 million.” The term “a request for an additional 23 million won as a deposit for the soil construction to reduce subcontracting.”

However, each of the above corporations has not existed from the beginning, and the defendant was entrusted with each of the above corporations by K.