Text
The sentence of sentence against the defendant shall be suspended.
Reasons
Punishment of the crime
The defendant of "2011 High Court 1879" is running construction-related business.
On August 7, 2008, the Defendant obtained a construction permit on August 11, 2009, with a size of 541.84m2, 95.67m2 (Building-to-land ratio-17.66%) total floor area of 149.54m2 (27.60%) above ground level 2/1 unit(1 household) of detached housing (1 household), two large-scale light-to-one unit parking number, and a building permit on August 11, 2009 as of the date of reporting the commencement of construction.
When the defendant intends to modify any construction permit, he knows that the construction permit should be constructed upon obtaining permission for change.
Nevertheless, on August 7, 2008, without obtaining permission for change from the head of the Gu with the head of the Gu, 541.84m2, building area of 541.84m2, 96m2(Building-to-land ratio-17.72%), total floor area of 96m2(17.72%) size of 96m2(17.72%) was constructed with 1st floor/2 detached houses(2 households) structure light steel
The Defendant is a person who is running a construction-related business. A. The Defendant is a person who is running a construction-related business.
On August 7, 2008, the Defendant received a construction permit on August 11, 2009, the size of 485 square meters in Suwon-si E site area, 95.67 square meters in building area (Building-to-land ratio-19.73%) and total floor area of 149.54 square meters (30.83 percent in size) from Suwon-si, Suwon-si, Suwon-si, Suwon-si, Suwon-si, Suwon-si, and on August 11, 2009.
When it is intended to change any matters different from those permitted for construction, it shall obtain permission for change from the competent authority.
Nevertheless, in November 2010, the head of the Gu, the head of the competent administrative office, changed the building area of 96 square meters (land-to-land ratio-19.35%), total floor area of 96 square meters (19.35%), the size of 1st floor/2 Dong on the ground, and one household and temporary warehouse for single house into a temporary warehouse.
B. On August 7, 2008, the Defendant: (a) 484m2 of the F site area in Suwon-gu, Suwon-si on August 7, 2008; (b) 95.67m2 of the building area (Building-to-land ratio-19.77%); (c) 149.54m2 of the total floor area (use rate of 30.90%); (d) 2m2/1 Dong on land; and (e) one household of