Text
1. The Defendant’s KRW 298,724,723 as well as the Plaintiff’s annual rate of 5% from July 28, 2013 to August 19, 2016.
Reasons
1. Basic facts
가. 원고는 2013. 7. 28. 피고가 운영하는 보광휘닉스파크 블루캐니언 워터파크(이하 ‘이 사건 워터파크’) 내 샤워장에서 몸을 씻던 도중 벽면에 설치되어 있던 조명등이 떨어져 깨지면서 날린 파편에 우측 발등을 찍혀(이하 ‘이 사건 사고’) 우측 발의 다발성 힘줄 및 근육의 손상, 열상, 우측 발 부분의 으깸손상, 우측 발등 동맥의 손상, 우측 발등 부위의 신경손상 등의 상해를 입었다.
B. From the same day to January 25, 2014, the Plaintiff was hospitalized in the B Hospital and the C oriental medical hospital, and thereafter, was transferred to the A-State University Hospital as an abnormal dog [multi-compactary Pain Syndrome (hereinafter “CRPS”)] while receiving rehabilitation treatment at the D Hospital.
C. On March 18, 2014, the Plaintiff received a final diagnosis from the said hospital as CRPS II, and received a medical examination with the content that: (a) the instant hospital was undergoing a continuous climatic blocking surgery; (b) the GRPS blocking surgery; (c) the Kenya’s assistant principal blocking surgery; (d) the Kenya’s beer beer; (e) the knene-knene-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kne-kn
[Ground of recognition] The fact that there is no dispute, Gap's 1 through 3, 5, 6, 15 (including each number; hereinafter the same shall apply)'s entries and the purport of the whole pleadings
2. According to each of the above facts finding liability for damages, the accident in this case occurred after lighting, which is a structure installed at a shower box in the above shower box, due to a defect in installation or preservation, and thus, the defendant, who is the possessor of the above facility, is liable to compensate the plaintiff for damages caused by the accident in this case pursuant to Article 758(1) of the Civil Act.
3. Except as otherwise stated below, the scope of damages shall be limited.