Text
Defendant
A A A A shall be punished by a fine of KRW 8 million, each of which shall be punished by a fine of KRW 5 million.
Reasons
Punishment of the crime
Defendant
C Co., Ltd. is a construction company with its head office in Busan-gun F, Busan-gun, and is a business owner who "H main complex construction work" in Busan-gu G.
Defendant
A is a general manager who manages the safety and health of workers belonging to C and workers belonging to the contractor company, who work at the site of the above “H complex construction work” as a site manager at C’s site.
Defendant
D Co., Ltd. (former trade name: Co., Ltd. E; hereinafter referred to as “D”) was changed to the location of the headquarters of D, a corporation whose headquarters is located in Busan Dongdong-gu I and II, Busan. on February 17, 2016.
As a steel and concrete construction business entity, the business entity is a business entity that performs construction works with a subcontract for “the part of steel and concrete construction works” at the site of “the construction works for complex on the H main roads” from Co., Ltd.
Defendant
B As a site manager of D, the “H-based composite construction works” is a person in charge of managing the safety and health of workers belonging to D, who work at the work site of “the steel and concrete construction works” among the “H-based composite construction works.”
1. On September 9, 2015, Defendant A, Defendant A, and B conducted the work of separating the construction of a complex on the second floor of the building constructed by the victim J (56 Doh) and attaching it to the third floor of the building by cutting off the pit pumps attached to the second floor of the building constructed by the employees affiliated with D Co., Ltd., including the victim J (56 Doh) (galthing, building built on the wall surface of the building and horizontally on the surface of the wall for the concrete building outside walls of the building, and the work board installed in a vertical line to enable workers to take up on the outside of the wall of the building so that they may take up on the outside the wall of the building.
The above work is to separate the pit pumps attached to the outer slope of the height of 4 meters adjacent to the outer wall of the building by the workmen, and use the crums.