1. The plaintiff's claims against the defendants are all dismissed.

2. The costs of lawsuit shall be borne by the Plaintiff.

Reasons

1. Basic facts

A. The Plaintiff is a company that engages in the business of leasing building materials, such as steel mill, etc.

Defendant B is a person who operates a secondhand shop in the name of “E” in Chungcheongnam-nam Budget Zone D, and Defendant C is a person who operates a secondhand shop in “E” with Defendant B as a type of sales by Defendant B.

B. On November 201, 201, F is a large divers of a steel-frame, which is used in construction works (large-scale bridges, multi-story bridges, high-rise buildings, etc.) of large scale, which are located in a warehouse located in G forest (this case’s warehouse, with fences and doors installed in wire-nets, but not in the form of a building; hereinafter “instant warehouse”).

Although there was no delegation from the Plaintiff, the owner of the instant steel file, etc. with the authority to dispose of the said steel product (hereinafter “the instant steel product”), the instant steel product was owned by the Plaintiff at one’s own seat, and was made a false statement that he was delegated with the authority to dispose of the steel product (hereinafter “the instant steel product”). However, the Plaintiff requested the sale of the instant steel product on the ground that the instant steel product was owned by the Plaintiff (at the time, the instant steel product was in a state of suspending the business on the water) with the trade name “I” in Seosan-si, Seosan-si, and

C. Accordingly, on November 6, 2011, J asked Defendant C, who had been aware of ten years prior to the same type of business, to have the intention to purchase the instant scrap metal in the scrap metal. On the same day, Defendant C directly confirmed the instant scrap metal in the warehouse.

(A) The steel product of this case was installed with fences made of wire nets and locking devices in the direction from the warehouse where the steel product of this case is loaded to the road. However, the steel product of this case was installed in a place where the steel product of this case was installed without having the entrance, because the steel net of the fence was teared. The steel product of this case was stored in the warehouse of this case since about 10 years ago.

arrow