Text
1. The plaintiff's appeal against the defendants is dismissed in entirety.
2. The costs of appeal shall be borne by the Plaintiff.
purport, purport, and.
Reasons
1. Basic facts
A. The Plaintiff is a legal entity established for the purpose of searching for and developing new functional substances using agricultural molecular biologicals, and Defendant B is a business registration holder of “C”, and Defendant A is a person who actually operates the said “C”.
B. On March 13, 2015, the Plaintiff entered into a contract for the supply of goods and construction work (hereinafter “instant contract”) with Defendant A, the agent of Defendant B, regarding the new construction of the Plaintiff’s overseas agricultural farm warehouse (hereinafter “instant warehouse”). The main contents are as follows.
Article III The scope of the Project under this Agreement shall be as follows:
C After purchasing all the materials following the new construction of a warehouse, C shall process them in conformity with the construction and supply them to the domestic place designated by the Plaintiff, and both parties shall sign a delivery certificate and complete the delivery when there is no anything wrong with the quality and quantity of the materials.
(b) Purchase of materials: March 2015;
C. Materials delivery: By April 1, 2015, the Plaintiff shall arrive at a place designated by the Plaintiff and the transport charges shall be borne by C.
On April 3, 2015, the cargo loaded in a container transferred to D shall be loaded by re-tallying with the Plaintiff and C.
D New Construction Works for Local Warehouse: Within 30 to 60 days of arrival of materials at the site of new construction of D Local Warehouse, C shall complete new construction of warehouse and, except in the case of modification of design, the problem of construction materials shall be resolved at C’s expense.
Article 4 Apportionment of Affairs
A. The goods processed and assembled by C are loaded in a container in cooperation with the Plaintiff at the designated place of the Plaintiff, and the Plaintiff is in charge of delivery and is responsible for and transported to D local arrival.
(b) C shall, after the smooth construction and assembly of all materials in line with D warehouse construction, be responsible for the new construction of D local farm warehouses and complete the construction of D local farm warehouses within the commitment date after the execution.
§ 5. Contracts.