logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 전주지방법원 2016.07.22 2016노533
위조사문서행사등
Text

The prosecutor's appeal is dismissed.

Reasons

1. According to the summary of the grounds for appeal (misunderstanding of the facts), although the defendant was found to have forged or used a contract for collection, transportation, and disposal of construction waste in the name of limited company G, as stated in the facts charged, the court below found the defendant not guilty of the facts charged on account of the misunderstanding of facts.

2. Determination

A. Summary of the facts charged 1) The Defendant who forged a private document is a limited company D (hereinafter “D”) operated by the Defendant, who is in Masan-gu Seoul Special Metropolitan City on September 17, 2013.

E 'E' at the office.

A waste treatment service contract (hereinafter referred to as "instant contract") among the removal works of the F of the Si/Gunsan-si and seven parcels of land.

B In doing so, the company G (hereinafter referred to as “G”) with limited liability known to the general public.

directors of H, if necessary, have been issued and held for a construction license loan;

Using G's business registration certificate, the truster who is liable to pay the service price is not D but G with the intention to avoid the obligation to pay the service price.

In preparing a contract under the name of G by telephone from the above office at the time of the above day, the defendant sent G's business registration certificate to E office located at Gunsan-si, as if he/she obtained the consent of G in preparing a contract under the name of G, and after allowing I to prepare an entrustment contract for construction waste collection, transportation, and disposal services using a computer at the above office at the above time and time, I would like to make I know of such fact to prepare a contract for the entrustment of construction waste collection, transportation, and disposal services using a computer at the above office, and from September 17, 2013 to September 30, 2013, the term of the contract for waste disposal from the company site for the above KK Power Station site to the truster L, and in the column of "(L) representative L," and in the trustee ( collector and transporter) column, "E (E) representative M," and to prepare a certificate of entrusted disposal capacity in the same manner, "E (E) representative" and "E) representative" in the column of entrustment.

arrow