(영문) 창원지방법원통영지원 2019.10.16 2019가단22264
손실보상금
Text

1. All of the plaintiffs' claims are dismissed.

2. The costs of lawsuit are assessed against the plaintiffs.

Reasons

1. Basic facts

A. C Co., Ltd. (hereinafter “C”) created a general industrial complex at Dawon-gun, Chungcheongnam-gun, Chungcheongnam-do. On July 5, 2016, on the following grounds: (a) 9291m2 (hereinafter “1m2”); (b) 9917m2 (hereinafter “2m2”); and (c) 22369m2 (hereinafter “3m2; 1, 2, and 3m2) of G factory site in the name of C with respect to each land of this case: (a) on the following grounds: (b) on July 5, 2016, the Defendant completed registration of preservation of ownership in the name of C with respect to each land of this case: (c) on the sectional superficies or lease for the construction and ownership of electric structures on the land before creating a general industrial complex; (d) on May 19, 2016, the Defendant did not register the change of divided superficies from C’s sectional superficies development project under the name of “H on May 16, 2016.

‘The proposal' was received.

After that, on June 30, 2016, the Defendant entered into a contract to establish superficies and divided superficies on each of the instant land with C and C, and completed the registration of creation of superficies and divided superficies under the name of C on July 5, 2016, on which C completed the registration of preservation of ownership. The content of each of the instant land is as follows.

The construction of the land superficies and electrical structures (a steel tower and power transmission line) on the land surface of 1, the duration of the land subject to classification, and the construction of the electric divided divided superficies structures (electric transmission line, etc.) and the construction of the electric divided superficies structures (electric transmission line, etc.) from the conclusion date of the contract to the expiration date of the building to the expiration date of the building on the land owned by the electric structure, and the installation of the electric divided superficies structures (electric transmission line, etc.) on the land owned by the air space of between 20 and 54 meters from the airspace above the land owned,