logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2016.09.08 2015가단54390
건물철거 및 토지인도
Text

1. The Plaintiff: (a) 179m20m20,000,000

A. Defendant B’s respective points are indicated in the Appendix No. 16, 17, 18, 19, and 16.

Reasons

1. Basic facts

A. On March 11, 1985, the Plaintiff is the owner who completed the registration of ownership transfer based on trading on April 5, 1974 with respect to 179 square meters (hereinafter “instant land”).

B. On the instant building, G around 1962, with respect to the instant building, with respect to the e/F ground wooden pole and the 52.56 square meters of single-story housing of the first floor, the primary roof, and the 18.51 square meters of the first floor (hereinafter “instant building”), adjacent to the instant land, G obtained approval for use and registered as the owner on the building ledger, and completed the registration of ownership preservation on June 29, 201. On June 29, 201, Defendant B completed the registration of ownership transfer on the said building on June 27, 2011.

C. The building of this case, among the land in this case, has one square meter on the ground level with the indication of 11 square meters and 20, 21, 22, 23, and 20 on the ground level (water supply facilities and prefabricated-type board) connected with each point of the attached table 16, 17, 18, 19, and 16, among the land in this case, among the land in this case, each part of the above land is affected by one square meter on the ground level (water supply facilities and prefabricated-type board). The Defendant B, for the possession of the building in this case, has occupied the part of the land in this case, which connects each point of the same map in sequence to each point of 1,2,3,4, 5, 9, 10, 11, 12, 13, 14, 15, and 11.

Defendant C, as the owner of H-ground building in the instant case, owns a block structure fence on the line connected each point in sequence with each point of 9, 10, 11, and 12, among the land in the instant case. The Defendant C, in sequence, owns the block structure fence on the line connected each point of 9, 10, 11, 12, 6, and 9 of the said drawings among the said land, and occupies two square meters of the land in the ship’s 3rd part of the land connected each point in sequence.

[Ground for recognition] Defendant B: A without dispute, each entry in Gap evidence 1 through 5 (including the number of branch offices), the result of the measurement and appraisal entrustment to the Sungsung branch of the Korea Land Information Corporation, the purport of the entire pleadings, Defendant C: Confession (Article 150(3) of the Civil Procedure Act)

2. Claim against the defendant B

(a)the cause of the action;

arrow