logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 창원지방법원 2018.12.06 2018가단104361
물품대금
Text

1. The plaintiff (appointed)'s claim is dismissed.

2. The costs of lawsuit shall be borne by the plaintiff (appointed party).

Reasons

1. Basic facts

A. The relation 1) The Plaintiff is an individual working person who mainly performs the painting work. The Selection C operates a private business entity with the trade name “D”, the Selection E operates a private business entity with the trade name “F”, the Selection G operates a private business entity with the trade name “H”, the Selection I operates a private business entity with the trade name “J”, and the Selection K Co., Ltd. (hereinafter “Selection K”).

A) A corporation is engaged in a building business, construction material supply business, etc., the Selection L operates a private company under the trade name of “M”, the Selection N operates a private company under the trade name of “O”, the Selection P operates a private company under the trade name of “ Q”, and the Selection P operates a private company under the trade name of “P”, and R Co.,, Ltd. (hereinafter “Selection”).

) The Company is a corporation operating a waste recycling business, etc., and the Selection S operates a personal business under the trade name of “T”, and the Selection U operates a personal business entity under the trade name of “V”, and the Selection W Co., Ltd. (hereinafter “Appointed”).

(2) On July 13, 2017, the Defendant, from around July 13, 2017, operated a private company with the trade name of “Y”, “A”, “Selection AB”, “AE”, operated a private company with the trade name of “AE”, “Selection AF”, and “AG” operated a private company with the trade name of “AG.”

B. The Plaintiff and the designated parties supplied materials or conducted construction works 1) when both the Plaintiff and the designated parties (hereinafter referred to as the “Plaintiff, etc.”) comply with all the Plaintiff and the designated parties, “Plaintiff, etc.”

(2) The Plaintiff et al. supplied materials or carried out some construction works at the construction site of this case, as shown in the attached Table 2.

arrow