logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 대구지방법원 2019.09.26 2018고단3916
절도등
Text

A defendant shall be punished by imprisonment for six months.

However, the execution of the above punishment shall be suspended for two years from the date this judgment becomes final and conclusive.

Reasons

Punishment of the crime

"2018 Highest 3916" Defendant carried out the construction of outer walls at the site of the pention Corporation located in Gyeongbukbuk B, and the victim C carried out the construction of the non-line pipe at the construction site at the above site.

At around 13:00 on July 17, 2017, the Defendant, at the above construction site, and at another construction site where the Defendant had been performing construction works at the time, the Defendant stolen the Defendant, carrying 32 non-meter pipes equivalent to 6m in length, 32 non-meter pipes equivalent to 3m in length, 20 non-meter pipes equivalent to 2m in length, 20 non-meter pipes equivalent to 1m in length, 10 square meters in total, 694,000 won in the market value, and loaded them on D Poter freight.

The Defendant is a person who runs a construction business under the trade name of “F” in Daegu Northern-gu E, and the victim G is a person who executes a service of constructing and delivering a reciprocal trading service of “H”.

On August 29, 2017, the Defendant starting from the Gancheon-gun, G in Daegu, the Defendant made a false statement to the effect that “The Defendant would pay the price within three days on the face of the week to deliver the crowdfunding to G from the expressway.”

However, in fact, the Defendant had no intention or ability to pay the cost normally even if he was supplied by the victim, because the labor cost that was paid at the time was approximately KRW 40 million to KRW 50 million, and the cost of materials and equipment that was not paid was demanded to pay KRW 30 million, and thus, even if he was paid the cost of construction from each construction site, he was required to pay the cost of construction by priority.

As such, the Defendant, by deceiving the victim and deceiving the victim, has the same year from August 31, 2017 to the point of view of the victim.

9. A total of 3740,000 won was supplied by the 19.19.

"2019 Highest 562"

1. The Defendant forged private documents I.D. on June 2017, 2017.

arrow