logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울남부지방법원 2016.10.27 2013가합2215
공사대금 등
Text

1. The Defendant: (a) 298,578,462 won in relation to the Plaintiff Kuho Industrial Co., Ltd.; and (b) 33,175,384 won in relation to the Plaintiff Heung Nam Construction Co., Ltd.

Reasons

(b) shall not become a ground for design change for the same reason;

(hereinafter referred to as "GUTER establishment" means the part already reflected in the Plaintiff's claim amount by the sequence Nos. 25,603,366 of the Defendant's summary of the 1 GUTTER ( The Home Center) to improve the domestic line to the ALHE TT Panel (AHE Panel).

2 It is the part that agreed to apply the agreed unit price to the design modification contract of KRW 4,019,631, the request for approval of the amount of the white paint.

3 It was pointed out by the responsible supervisor as part of the work arbitrarily without the direction of the responsible supervisor in charge of the amount of 18,406,898 won applied to the open book for each stage of the 3rd stage.

4 At the time of the third design modification, the part agreed at the time of the third design modification regarding the unit price of 91,348,014 won which is requested to be changed to the existing unit price of contract for the additional quantity at the time of the third design modification.

5 The construction of a AL 100*100*100*4.5T 13,013,152 is already reflected in this part at the time of the fifth design modification contract.

6 Since the establishment of FS02A, 5,268,366A could be recycled into another fire-fighting exhaustr (FS) after removal of FS02A, which was arbitrarily treated and did not report to the responsible supervisor.

7 It is a portion of the cost of inserting each pipe of mersh, which is applied 456,537 won to the plaintiffs' improper construction and re-construction according to the direction of the responsible supervisor.

8 There was no specification in the design document of KRW 9,583,311, applied to the 8 entrance glarum flusium flusium flusium flusium flusium flusium flusium flusium flusium.

9 Of the 100 KY CABINT capacity, it is not specified in 797,971 Won design that is requested to modify four of the 100 KY CABINT capacity, and the defendant has not ordered the execution and is unnecessary construction.

10 It is already related to raising earth and sand in the parking lot of KRW 148,291,045, such as earth and sand on the parking lot for civil works.

arrow