logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 서울중앙지방법원 2019.07.24 2018가단5046243
구상금
Text

1. The Defendant’s KRW 40,480,144 as well as the Plaintiff’s annual rate from September 5, 2016 to March 15, 2018.

Reasons

1. Facts of recognition;

A. (1) The Plaintiff is an insurance company and the insured for the non-party C Co., Ltd. (hereinafter “C”) and C’s nationwide business site, and the insurance period is determined from May 31, 2014 to May 31, 2015. The comprehensive property risk security 1. The comprehensive property risk security;

4. Liability risk security includes the type of insurance.

(2) The Plaintiff’s insurance contract is the Plaintiff’s insurance company that runs the insurance business and sells children’s sports products. (2) The Defendant is a company that runs the insurance business and is the insured with H’s nationwide business place between the non-party Company H (hereinafter “H”) and the insured on May 31, 2015, the insurance period of the F department stores located in the E-building located in the land of non-party D (hereinafter “F department stores”) located in the 5-6th floor (hereinafter “G store”). The G store located in the 5-6th floor (hereinafter “F department stores”).

1. Comprehensive risk of property:

4. Guarantee of liability for damages; and

(B) Around 13:15 on April 8, 2015, when the occurrence of the accident occurred, the elbow in the sewage pipe, which was buried and managed in the 7th floor of the above FF department store (hereinafter “I store”), was an accident in which the elbow in the sewage pipe, which was located in the G store located in the next floor, flows out, such as food wastes, etc., while the elbow in the G store located in the lower floor, was the insured under the insurance contract of the Defendant (hereinafter “the accident in this case”).

A person shall be appointed.

C. The accident of this case involving the Plaintiff’s payment of insurance money caused damage to the ceiling, wall, interior interior water and inventory goods of G burial. Accordingly, C suffered damage to facilities, collection fixtures, inventory assets, etc., and the Plaintiff deemed C as KRW 43,480,144 as follows.

arrow