logobeta
본 영문본은 리걸엔진의 AI 번역 엔진으로 번역되었습니다. 수정이 필요한 부분이 있는 경우 피드백 부탁드립니다.
텍스트 조절
arrow
arrow
(영문) 수원지방법원 2020.07.02 2019나88903
건물등철거
Text

The judgment of the first instance, including the claims added by this Court, shall be modified as follows:

The defendant.

Reasons

1. Basic facts

A. On May 1, 2008, the Plaintiff completed the registration of the transfer of ownership in the name as the Suwon District Court’s receipt No. 62081 on May 1, 2008, with respect to the land of Suwon-si, which was divided into the area of 550 square meters of land in the wife C (D forest No. 14,578 square meters on July 1, 2019; hereinafter “instant land”).

B. L is an owner of the land of this case, which is located in the vicinity of the instant land, and of the land of this case, including the said F-based forest land of 949 square meters, the land of this case, the land of 664 square meters in the wife population G, the O forest land of 17,851 square meters, and the construction of a building (the building of this case is a structure connected with the two manufacturing places and one warehouse; hereinafter “the building of this case”) on the four lots of land of 17,851 square meters in Yongsan-si located in the vicinity of the instant land, and the use thereof was approved on February 28, 199, and the registration of ownership preservation was completed on August 22, 200. The building register and the registry are written in the building of this case, which is not the land of this case, but the land of this case.

C. The instant building, including the instant part (d) section, is used as the site for the instant building, where the part (c) part (d) in the ship connected in order to each point of 3, 49, 48, 47, 46, 45, and 33, among the instant land, is 185 square meters (hereinafter “the instant part (d)”). The instant part, including the said part (d), is used as the site for the instant building, which is 274 square meters (hereinafter “the instant part (c)”) of the land, which is connected in order to each point of 1,34, 42, 43, 44, 44, 45, 33, 49, and 1 in sequence.

On June 1, 2015, the Defendant purchased a building of this case and the building of this case (hereinafter referred to as the “individual land”) with the wife E 1,275 square meters, F forest land of 949 square meters, G land of 664 square meters, P forest land of 883 square meters (hereinafter referred to as “individual land”) and completed the registration of transfer of ownership in its name as of July 15, 2016.

The date of change of ownership and specific changes in the building of this case shall be as follows:

Change (the date of change) L(the date of August 22, 200)(M( August 25, 2000).

arrow