(영문) 대구지방법원김천지원 2015.04.08 2014가단10188
손해배상(기)
Text

1. Defendant Korea Rural Community Corporation shall pay to the Plaintiff KRW 2,5310,000 as well as to the Plaintiff from January 27, 2015 to April 8, 2015.

Reasons

1. Basic facts

A. The Plaintiff is the owner of B orchard 7,136 square meters, C forest land 16,101 square meters, D forest land 1,945 square meters (hereinafter “instant land”) at the time of residence.

B. On June 14, 2010, the Defendant Korea Rural Community Corporation (hereinafter “Defendant Corporation”) obtained approval of the implementation plan for the project to remodel the farmland of the YY-gu Seoul Special Metropolitan City (hereinafter “instant project”) with regard to the so-called Seongbuk-gun, the Seongbuk-si Special Metropolitan City Do Do Do Do Do Do Do Do Do Do Do Do Do, and the Gu Do Do Do Do Do Do Do Do Do Do Do Do si Do Do Do Do Do Do Do Do Do si, and decided on July 22

C. The Plaintiff and the Defendant Corporation agreed on the instant land around March 201 as follows:

(hereinafter “instant agreement”). The grave in the instant land shall not interfere with the construction by the Plaintiff’s relocation and removal prior to the commencement of the Defendant Corporation’s work.

When a base team is higher than the EL. (eva, ancient level) in the design documents at the time of the instant land work, it shall be suspended on the basis of EL. In the event of a base team, and it shall be prevented from hindering the subsequent use of the land.

When the work is completed, the good soil shall be molded at least 50cm after flat work.

A person who may occur in the use or work of the instant land, a permit, and a collection of soil and sand, and a civil petition (surgical dust, noise, safety measures, etc.) arising in the course of removal is under the responsibility of the Defendant Corporation.

The disposal of trees and waste within the land of this case shall be disposed of by the Defendant Corporation in a lawful manner.

When a design change or a change in construction method occurs, the defendant corporation shall notify the plaintiff and consult with him/her.

The time of the use of the instant land and the completion of construction is until December 31, 201.

The Defendant Corporation may remove 71,400 square meters from the date of permission to gather earth and sand for the instant business from the permanent address market on January 16, 2012 to October 31, 2012.