(영문) 수원지방법원 2019.03.20 2017가단539895
손해배상(기)
Text

1. The Defendant’s KRW 54,115,48 as well as the Plaintiff’s annual rate from June 27, 2017 to March 20, 2019.

Reasons

1. Basic facts

A. The Plaintiff is the owner of D concrete pumps (hereinafter “instant vehicle”) with the trade name “C”. The Plaintiff is the owner of D concrete pumps.

The defendant is a company running the construction business, and the business owner newly constructed the E Apartment from June 7, 2015 to January 24, 2018.

(hereinafter “instant construction project”). (b)

The Defendant, among the instant construction works, awarded contracts to F Co., Ltd. on December 5, 2015 and to G Co., Ltd on February 25, 2016.

F Co., Ltd and G Co., Ltd entered into a concrete type of business contract with the Plaintiff.

C. On June 27, 2017, the Plaintiff sent the instant vehicle and the instant vehicle driver H to the construction site of the instant construction site to build concrete. On the same day, the place where concrete is removed was neighborhood living facilities, access roads to underground parking lots, and guard rooms.

H stopped the instant vehicle at the location of the table 1 below, which was originally covered by concrete packaging, and prepared for the removal of the said vehicle at the location of the attached Table 1, and the Defendant’s employees I requested that the said vehicle move to the place of the attached Table 2 for the removal of the said vehicle because it is difficult to move the vehicle because the vehicle was moving back to the front place when the vehicle was installed at the above location.

At the time of the construction site of this case, J and H did not raise any objection against this.

On the other hand, the above places were the soil floor without concrete packaging.

K L

D. However, around 09:00 on the same day H’s day, the ground of the place where a device for supporting the pumps was located in front of the left side of the given vehicle, which begins with the instant vehicle by using the instant vehicle. Accordingly, the said vehicle’s booms down to the bottom, resulting in the booming price on the floor.