(영문) 서울중앙지방법원 2020.05.22 2019가단5052306
구상금
Text

1. The Defendant’s KRW 180,063,954 for the Plaintiff and KRW 5% per annum from February 2, 2019 to March 18, 2019.

Reasons

1. Facts of recognition;

A. On April 30, 2018, the Plaintiff entered into an insurance contract (hereinafter “E insurance contract”) with C (hereinafter “C”) with the insured, the insurance period from April 30, 2018 to April 30, 2023, with the content that the Plaintiff would compensate for fire damage, etc. with the Ulsan-gun, Ulsan-gun, 1, and 2-story (hereinafter “instant factory”), machinery, office fixtures, and movable property (hereinafter “instant insurance contract”).

B. C is referred to as the heat room, heat room, melting room, string room, and string machine in the first floor work room of the factory of this case as a company operating a tar manufacturing business, etc. of this case. The evidence submitted by the defendant for melting solid dust, etc. produced and supplied by the defendant, and in writing, it is referred to as the heat room, heat room, string room, hing room, etc.

(hereinafter “instant machinery”).

C. From November 14, 2018, from around 20:00 to around 20:0, F used the instant machinery to melt the solid dust, etc.; on November 15, 2018, at around 04:03, the first part of the lower pipe pipe pipe of the instant machinery was confirmed, and the combustion was expanded to the surrounding areas, the instant plant and parts of the machinery and movable property in the instant site were destroyed by an accident.

(hereinafter “instant fire”). D.

The details of the report on investigation regarding the fire of this case are as follows.

1) On November 15, 2018, the fire site investigation report (date and time of investigation: 04:04 to 06:32 on November 15, 2018), ① the summary of the fire investigation - the fire that occurred in the factory producing high-ion temperature ices by processing the sent-in dusts, two seconds, etc. at the above place - the emergency bells and explosions during which the employees G (Nam, 30 years old) of the last reporter C were placed in the second floor of the office, and the fire was reported to the first floor work room. While one foreign worker other than the reporter, at the time of the fire, attempted to extinguish the initial fire by using the fire extinguishing machine, but the fire and the smoke were evacuated out of the factory. The CCTV confirmed, the heat room in the factory (melt stud, e.g., the melt stud.).