Text
1. The Defendant’s KRW 37,863,200 as well as 5% per annum from March 10, 2018 to March 20, 2019 to the Plaintiff.
Reasons
. Facts of recognition.
A. On January 2, 2018, the Defendant entered into a lease agreement with the Plaintiff on the C Co., Ltd. (hereinafter “C”) with respect to the C crawls (registration number E; hereinafter “instant C crawls”) with the following content in order to carry out construction works to dismantle bridges of D 1 access road and bridge (hereinafter “instant construction”).
(hereinafter “instant lease agreement”). The standard construction machinery lease agreement
2. Period of use: From January 2, 2018 to January 17, 2018 (15 days) (the date of assembly and dissolution shall be included in the rental period).
3. Amount, terms and conditions of use: 20,00,000 won per month (including the king transport cost, assembly and scrapping cost)* Additional duty, and the post-settlement settlement at the time of the occurrence of the O/T * All the Corporation for the reinforcement of the ground * the Lessee’s preparation and the Lessee’s responsibility at the time of the occurrence of a safety accident that occurs during work on the site.
4. Operational hours: ( Strategy) If the number of days in excess exceeds 15 days a month, the daily calculation shall be made in addition to 1,000,000 won per day; and
B. After the completion of the instant construction, the Plaintiff dismantled on January 20, 2018 and loaded on Lowed Accenture Vehicles (registration number F; hereinafter “instant 1”) and moved along the access road (hereinafter “the access road”) at the construction site of this case, indicated “100 ccicks” as the photo on the instant 130 tons of the instant 1 vehicle and the instant cler’s cler’s vehicle used for dismantling the instant cler’s (registration number G; hereinafter “instant 2 vehicle”).
The accident occurred in which the wheels part of the access road of this case was omitted to one stop.
hereinafter referred to as "the accident of this case"
(C) The Plaintiff: (a) KRW 17,105,00 (= KRW 7,205,000) for the salvage work for vehicles 1 and 2 in the instant case; (b) KRW 24,167,00 for the restoration work for the access road in the instant case (i.e., KRW 4,950,000) and KRW 24,167,000 for the restoration work for the access road in the instant case (i.e., KRW 4,950,000).